Seeing a claim through to fruition requires an eye for details
$225.00
Description
Abstract: One might assume that a claim for “differing site conditions” would cover items such as additional pile depths and the removal and replacement of unsuitable subsurface material under slab-on-grade floors. This article looks at a case involving the Army Corps of Engineers and a storage base in Israel that shows a court might not make the same assumption.
Additional information
Year | |
---|---|
Niche | |
Newsletter | |
Issue | |
Word Count |